Exterior & Yard:
- replace fence (cedar, stained)
- add one more coat of Rebel Blue paint to gable ends
- general paint touch-up around house
- add one more coat of white paint to trim around all exterior doors
- clean, paint and re-install shutters
- install paver path
- build new SW gate (cedar, stained)
- brick retraining wall along west fence
- paint west door
- install storm door (?)
- paint front door
- remove river rock from west side of driveway; replace with flowerbed
- build east lattice (near heat pump) and plan climbing bushes
- build new east fence gate
- build back wood deck (over existing cement patio)
- finish shed repair (trim pieces)
- finish dog house repair (trim pieces, porch flooring)
- remove all river rock from staging area
- develop shed area into herb garden
- plant privacy hedge between upper and lower areas
- finish back-yard landscaping (general plants and bushes)
- retaining wall maintenence
- finish fill behind retaining wall
- remove yard debris from east-side pile ("garden of death")
- remove debris pile from lower area ("the pit")
- figure out what to do with lower area (formerly the RV pad....)
Crawlspace:
- insulate all air ducts and warm-water pipes
- deal with standing water; grade soil and dig drainage trenches
Garage:
- create "dog central" area
- paint walls and ceiling
- replace cabinets and install new shelves
- replace door between garage and family-room
Family Room:
- replace interior door (to kitchen)
- replace sliding glass door (to patio)
- replace molding and baseboards
- replace sliding door curtains / blinds
Dining Room:
- replace window
- replace molding, casings and baseboards
- replace light fixture
Living Room:
- replace windows
- replace molding, casings and baseboards
Entry and Hallway:
- install screen door (or storm-door)
- replace interior door to closet
- replace closet door (by entry)
- replace molding, casings and baseboards
Master Bedroom:
- replace window
- replace interior doors to bath and hallway
- replace closet door pair
- replace molding, casings and baseboards
Master Bath:
- move toilet
- replace flooring
- install new faucet and sink
- replace cabinets and countertop
- replace molding, casings and baseboards
- replace light fixture
Main Bath:
- repair floorboards
- install new faucet and sink
- replace cabinets and countertop
- replace window
- replace flooring
- replace molding, casings and baseboards
SE Bedroom:
- replace window
- replace interior door to hallway
- replace closet door pair
- replace molding, casings and baseboards
South Bedroom:
- replace window
- replace interior door to hallway
- replace closet door
- replace molding, casings and baseboards
Kitchen:
- paint ceilings and walls
- replace ceiling light fixtures
- replace window
- replace faucet and sink
- replace all cabinets and countertops
- paint (white) or remove sliding pocket door
- replace molding, casings and baseboards
- replace flooring
|