Home Project List


Exterior & Yard:
  • replace fence (cedar, stained)
  • add one more coat of Rebel Blue paint to gable ends
  • general paint touch-up around house
  • add one more coat of white paint to trim around all exterior doors
  • clean, paint and re-install shutters
  • install paver path
  • build new SW gate (cedar, stained)
  • brick retraining wall along west fence
  • paint west door
  • install storm door (?)
  • paint front door
  • remove river rock from west side of driveway; replace with flowerbed
  • build east lattice (near heat pump) and plan climbing bushes
  • build new east fence gate
  • build back wood deck (over existing cement patio)
  • finish shed repair (trim pieces)
  • finish dog house repair (trim pieces, porch flooring)
  • remove all river rock from staging area
  • develop shed area into herb garden
  • plant privacy hedge between upper and lower areas
  • finish back-yard landscaping (general plants and bushes)
  • retaining wall maintenence
  • finish fill behind retaining wall
  • remove yard debris from east-side pile ("garden of death")
  • remove debris pile from lower area ("the pit")
  • figure out what to do with lower area (formerly the RV pad....)

Crawlspace:
  • insulate all air ducts and warm-water pipes
  • deal with standing water; grade soil and dig drainage trenches

Garage:
  • create "dog central" area
  • paint walls and ceiling
  • replace cabinets and install new shelves
  • replace door between garage and family-room

Family Room:
  • replace interior door (to kitchen)
  • replace sliding glass door (to patio)
  • replace molding and baseboards
  • replace sliding door curtains / blinds

Dining Room:
  • replace window
  • replace molding, casings and baseboards
  • replace light fixture

Living Room:
  • replace windows
  • replace molding, casings and baseboards

Entry and Hallway:
  • install screen door (or storm-door)
  • replace interior door to closet
  • replace closet door (by entry)
  • replace molding, casings and baseboards

Master Bedroom:
  • replace window
  • replace interior doors to bath and hallway
  • replace closet door pair
  • replace molding, casings and baseboards

Master Bath:
  • move toilet
  • replace flooring
  • install new faucet and sink
  • replace cabinets and countertop
  • replace molding, casings and baseboards
  • replace light fixture

Main Bath:
  • repair floorboards
  • install new faucet and sink
  • replace cabinets and countertop
  • replace window
  • replace flooring
  • replace molding, casings and baseboards

SE Bedroom:
  • replace window
  • replace interior door to hallway
  • replace closet door pair
  • replace molding, casings and baseboards

South Bedroom:
  • replace window
  • replace interior door to hallway
  • replace closet door
  • replace molding, casings and baseboards

Kitchen:
  • paint ceilings and walls
  • replace ceiling light fixtures
  • replace window
  • replace faucet and sink
  • replace all cabinets and countertops
  • paint (white) or remove sliding pocket door
  • replace molding, casings and baseboards
  • replace flooring



Back Home e-mail

Go back to the previous page.
Contact webmaster@volzpdx.com with questions or comments.
Last updated September 21st, 2005. All rights reserved.
©2001-2008 VolzPDX®, Portland Oregon.